
Custom Deck Builder in Los Angeles
Quick answer: ION Builders is a licensed deck builder in Los Angeles and Ventura County. We design and build custom decks of every shape, including multi-level, curved, wrap-around, freestanding and attached decks, in Trex and TimberTech composite, PVC or wood. Every project includes design, engineering when needed, permits, construction and final inspection, so you work with one licensed contractor from the first site visit to the finished deck.
Licensed General Contractor (CSLB #1069085) · TrexPro Platinum builder · TimberTech Silver Pro contractor · Serving Los Angeles and Ventura County
Custom decks we build
| Deck type | Best for | What to know |
|---|---|---|
| Attached deck | Extending the living space out from a door | Connected to the house with a ledger board that must be flashed and bolted to code |
| Freestanding deck | Garden decks, decks away from the house | Carries itself on its own posts and footings |
| Multi-level deck | Sloped yards and separate dining and lounge areas | Each level gets its own framing and stairs between levels |
| Curved deck | Modern designs and softer shapes | Curved boards need heat-bending or special framing |
| Wrap-around deck | Homes with doors on several sides | Framing turns corners and follows the house |
| Deck with built-ins | Seating, planters, lighting and privacy screens | Built-ins are planned into the framing from the start |
| Deck replacement | Old, rotted or unsafe decks | Check the footings and framing, then rebuild to today's code |
For sloped lots, see our hillside decks. For space above the house, see our rooftop decks and balconies.
Decking materials compared
| Material | Maintenance | Lifespan | Good to know |
|---|---|---|---|
| Composite (Trex, TimberTech) | No staining or sealing; wash it now and then | Long warranties, often 25 to 50 years | The most popular choice for LA homes |
| PVC (TimberTech AZEK) | No staining or sealing | Longest warranties | Lighter weight and stays cooler than many composites |
| Class A fire-rated composite or PVC | No staining or sealing | Long warranties | Needed in many Very High Fire Hazard Severity Zones |
| Redwood or cedar | Clean and seal every 1 to 3 years | Depends on care | Natural look; not allowed as a walking surface in some fire zones |
| Pressure-treated wood | Clean and seal regularly | Depends on care | Mostly used for framing under composite decks |
Compare the two leading brands in Trex vs. TimberTech.
How we build a custom deck that lasts
- ●Footings and framing. Concrete footings sized for the soil, pressure-treated, steel or aluminum framing, and the right joist spacing for the decking you choose.
- ●A safe connection to the house. Attached decks use a flashed ledger board bolted to the house framing, the most common failure point on old decks.
- ●Hidden fasteners and clean details. Hidden fasteners, picture-frame borders and fascia boards for a finished look.
- ●Code-height guards. Decks more than 30 inches above the ground need guards at least 42 inches high in California, with openings small enough that a 4-inch sphere cannot pass through. See our railing services.
- ●Stairs and lighting. Code-compliant stairs, handrails and optional built-in step and post lights.
Permits for decks in Los Angeles
Most decks that are attached to the house, more than 30 inches above the ground or larger than 200 square feet need a building permit. Permits come from LADBS in the City of Los Angeles, from the city's own building department in cities such as Glendale, Burbank, Pasadena, Santa Monica, Calabasas and Thousand Oaks, and from LA County Public Works in unincorporated areas. In Very High Fire Hazard Severity Zones, decks must also meet California Building Code Chapter 7A. ION Builders prepares the plans, submits them and schedules every inspection.
What drives the price of a custom deck
ION Builders prices every deck after a site visit, because these factors change the total:
- ●Size and shape: square footage, levels, curves and stairs.
- ●Height and site: taller decks and sloped lots need more framing, footings and railing.
- ●Decking material: composite, PVC, Class A fire-rated or wood.
- ●Railing: cable, glass, aluminum or composite.
- ●Built-ins and lighting: benches, planters, privacy screens and lights.
- ●Demolition: removing an old deck.
- ●Engineering and permits.
Read the full guide: what drives the cost of a custom deck in Los Angeles.
Why homeowners choose ION Builders for custom decks
- ●Licensed general contractor (CSLB #1069085) and certified Trex and TimberTech installer.
- ●One team from design to final inspection, including permits and engineering.
- ●Experience across LA, from flat backyards to hillside lots, rooftops and pool decks.
- ●Fire-aware construction with Class A decking options for fire zones.
- ●Clear, written pricing after a site visit.
See our deck projects and before and after photos.
Frequently asked questions about custom decks
Check that the contractor has an active California license on the CSLB website, carries insurance, pulls permits, and can show finished projects like yours. A certified Trex or TimberTech installer has been trained on that brand's installation and warranty requirements.
Usually. Decks attached to the house, more than 30 inches above the ground or larger than 200 square feet generally need a permit, and rules vary by city. ION Builders handles the plans and permits for you.
Composite or PVC decking from Trex or TimberTech is the most popular choice because it handles sun and dry heat with no staining or sealing. In fire zones, choose a Class A fire-rated board.
It depends on the size, height, shape, decking and railing material, built-ins and permits. ION Builders gives a written, itemized price after a free site visit.
Design and permits usually take the longest. Once permits are issued, most custom decks take 1 to 3 weeks to build, depending on size and complexity.
Yes. We remove the old deck, check the footings and framing, replace what is needed and install new composite or PVC decking and railings.
Often, yes. A low deck can be built on sleepers or pedestals over a sound, well-draining slab. We check the slab and drainage first.
Yes. In Very High Fire Hazard Severity Zones we use Class A fire-rated decking and noncombustible framing where needed to meet California Building Code Chapter 7A.
All decking gets warm in full sun. Lighter colors and PVC boards stay cooler, and shade from a patio cover or pergola helps a lot.
We build custom decks across Los Angeles and Ventura County, including Studio City, Sherman Oaks, Encino, Tarzana, Woodland Hills, West Hollywood, Beverly Hills, Brentwood, Pacific Palisades, Santa Monica, Venice, Silver Lake, Los Feliz, Glendale, Burbank, Pasadena, Calabasas, Agoura Hills, Westlake Village and Thousand Oaks.
Custom Deck Projects We've Built
Every project is unique. Explore more of our custom deck builds and outdoor living spaces.


Ready to Build Your Custom Deck?
Schedule your free consultation today and start building an outdoor space designed around your home, your lifestyle, and your vision.
SCHEDULE YOUR FREE CONSULTATION